Home Categories Send inquiry

Cheap price Split Bolted Connector - LOW VOLTAGE TIN-PLATED COPPER LUG (WITH INSPECT HOLE) SC(JGA) SERIES – Yongjiu

MANUFACTURED BY PURE ELECTROLYTIC COPPER. Cu ≥99.9% COPPER LUGS & CABLE TERMINALS FROM 2.5 TO 630 MM2 WITH DIFFERENT STUD HOLE SIZES AS REQUIRED . LEAD FREE ELECTRO TIN PLATED TO PREVENT ATMOSPHERIC CORROSION. CABLE LUGS ARE FULLY ANNEALED TO GUARANTEE OPTIMUM DUCTILITY.

Item No.

Applicable Bolts

Dimensions(mm)

G.W (kg)

   

D

d

L

L1

S

W

 

SC(JGA)-6

m6,m8

6

4.8

24

8.5

1.2

9

18.5

SC(JGA)-10

m6,m8

6.6

5.3

27

9.0

1.2

10

21.0

SC(JGA)-16

m6,m8,m10.5

8

6.2

31

11.0

1.9

12

23.0

SC(JGA)-25

m8,m10.5

9

7

33

13.0

2

13.5

24.0

SC(JGA)-35

m8,m10.5

10.5

8.5

38

14.0

2

15.5

23.0

SC(JGA)-50

m8,m10.5,m12.5

12.5

10.1

45

17.0

2.4

18.5

20.0

SC(JGA)-70

m8,m10.5,m12.5

14.5

12

50

18.0

2.6

21.5

14.0

SC(JGA)-95

m10.5,m12.5

17

14

56

20.5

3

25.5

22.0

SC(JGA)-120

m10.5,m12.5,m14.5

19

15.5

61

24.0

3.5

28

17.0

SC(JGA)-150

m12.5,m14.5,m16.5

21

17

68

26.0

4

30.5

21.5

SC(JGA)-185

m12.5,m14.5,m16.5

24

19

76

28.0

5

35

26.0

SC(JGA)-240

m12.5,m14.5,m16.5

27

21.6

90

33.0

5.5

40

29.0

SC(JGA)-300

m16.5

30

24

100

38.0

6

43.5

26.5

SC(JGA)-400

m16.5,m18.5

32

26

110

41

6

52.5

30.0

SC(JGA)-500

m20.5

38

30

123

42

8

55

32.0

SC(JGA)-630

m20.5

45

36

135

53.5

8.6

65

25.0 

Quality Assurance 1.Every raw material has a test report. 2.Advanced equipment for quality precision machining. 3.Complete testing equipment ensure the performance of the product meets the standard and closely related to internationally accredited laboratories. 4.Strict quality inspection standards have strict quality procedures at the beginning of production, in the middle of production and in the completion of packaging. 5.ISO9001 certificate. Every workshop has a designated quality inspector to inspect every link of production materials from entering, producing to finished products. Make sure that the person in charge of each workshop returns to the factory director one day's production progress and quality inspection.